Leveraging on our experience with moist, plastic and sticky material with our proprietary bucket solutions we can offer now a wide variety of tailor-made solutions to transport and store any type of bulk material like coal, clay, iron ore, limestone, fertilizer, clinker, cereals and many others, covering any capacity from 100 to 10.000 ton per hour.

Solutions

In 1992, the UN introduced the concept of ‘sustainability’, defined as ‘Development that meets the needs of the present without compromising the ability of the future generations ...
Read more

About this project

Open

Catalina – Dominican Republic

01 / 32

Catalina – Dominican Republic

For the new greenfield Coal Power Plant in Punta Catalina (Santo Domingo), Bedeschi supplied a Complete Material Handling equipment set from coal receiving rail Mobile Hopper on jetty, to coal storage and delivery, up to loading point at the boiler area. The total plant capacity is 2x360 MW. The main feature of this supply is the 2150 m long pipe conveyor (D.700 mm) with a 3000 tph capacity. The difficult weather conditions made the design phase extremely challenging for the equipment and its structures. Indeed, the area is frequently subjected to heavy winds (hurricane & tsunamis area), possible liquefactions of soil and earthquakes.