Handling

SCROLL TO
EXPLORE BEDESCHI

Leveraging on our experience with moist, plastic and sticky material with our proprietary bucket solutions we can offer now a wide variety of tailor-made solutions to transport and store any type of bulk material like coal, clay, iron ore, limestone, fertilizer, clinker, cereals and many others, covering any capacity from 100 to 10.000 ton per hour.

Solutions

In 1992, the UN introduced the concept of ‘sustainability’, defined as ‘Development that meets the needs of the present without compromising the ability of the future generations ...
Read more

Case study

About this project

Open

Puerto Brisa – Colombia

01 / 32

Puerto Brisa – Colombia

Bedeschi has completed the turn key supply of complete 10 Mio year coal export terminal in La Guajira on Colombia’s Caribbean coast. The main equipments are a 3.5 km overland conveyor from the coal storage to the dock and a shiploader. The entire system can work at a rate of 6000 tph when loading 120.000 ton DWT vessels.The travelling, slewing and luffing shiploader has a curved chute designed to enable complete distribution of the cargo inside the holds of vessels so as to avoid broken space. All engineering, manufacturing and assembly of entire system has been developed within the group.