For the new greenfield Coal Power Plant of Punta Catalina, Santo Domingo, Bedeschi supplied a Complete Material Handling equipment set from coal receiving rail Mobile Hopper on jetty up to coal storage and delivery up to loading point at boiler area.
The total plant capacity is 2×360 MW. Main characteristic of this supply is a 3000 tph capacity 2150 m long pipe conveyor (D.700 mm).
Project environmental conditions constrained and lead to an extremely challenging design phase of equipment and structures due to very heavy wind (hurricane & tsunamis area), soil (instability & potential liquefaction) and earthquake conditions.