The equipment have been installed at the Ammonia Plant,Granular Urea Plant, while the utilities and off-shore facilitiesat Aswan city Upper Egypt. The project is to be undertaken byEgyptian Chemical Industry (KIMA) and it has been developedwith our historical client Tecnimont. It regards the transport ofthe fresh urea coming from granulation to bagging silos or tourea bulk storage and the transport of the reclaimed urea frombulk storage to bagging silos.

The supply consists in a complete handling system, specifically:a reclaimer with a capacity of 240 t/h, a belt conveyor line witha total lenght of 1000m, 3 tripper cars, diverters, a dedustingsystem for each transfer point, vibrating screens, belt weighers.

Moreover, Bedeschi will be responsible of the transfer of all thetowers and galleries and will supply a complete control system.