BLOG

Ship Unloader Loading Operations

This video showcases the loading operations of the Bedeschi’s ship unloader, which weighs nearly 700 tons.

This project presented several challenges, but we successfully found the best solutions to load it safely and efficiently.

The unloader was positioned on the quay two days before the vessel’s arrival, ready to be lifted and shipped fully erected. It required strong teamwork to determine the right approach that allowed us to transport the machine without dismantling the heavy counterweights or other components. The identified approach, ensured a fast and safe delivery to the customer at the final destination.