BLOG

Aerial view of the site under construction.

Aerial view of the pipe conveyor Bedeschi supplied to Ciment Quebec in Canada.

The pipe conveyor will handle limestone, gypsum, slag and silica at a rate of 1000 t/h with bulk density of 1.3 t/m3.
The pipe is more than 300 m long with a diameter of 350 mm and a belt width of 1400 mm.

Here is the site under construction.