Site update from the plant where Bedeschi is finalizing the installation for Mitchell Cement Plant in the US. The supply includes 2 crusher units, 2 apron feeders, one stacker, and one reclaimer. Both stacker and reclaimer are installed inside a longitudinal park. In the pictures, the stacker and the reclaimer at the final stage of installation. The stacker will handle limestone at a capacity of 1200 t/h, while the reclaimer has a capacity of 650 t/h.