BLOG

Loading operations of two shiploaders and one ecohopper fully erected

Amazing loading operations accomplished by Bedeschi Team in Dubai (UAE).
Two shiploaders and one echopper fully erected have been loaded in Jabel Ali port, ready to be shipped to Ghana Takoradi Port.
Thanks to the efforts of the whole team involved in the project for such an impressive milestone.

The equipment is part of the project awarded by Bedeschi S.p.a. in the Port of Takoradi – Ghana.
The scope of the project is the supply of handling equipment and services for bauxite and manganese in export and clinker in import including:
– 5 conveyor belts for a total length of av. 3 km;
– 2 shiploaders A frame type mod. 50/1400;
– one eco-hopper
The project is state of the art for the environmental standards: dust collection and de-dusting system have been specifically designed for this application