BLOG

Fully erected shiploader ready to be shipped

The shiploader Al Sarh Trading Co. commissioned to Bedeschi S.p.a. has just been shipped fully erected. The shiploader is designed to load gabbro and other materials. Approximately 2 km on open sea, there is a shiploader luffing and slewing type, with capacity of 2.000T/h designed to load vessels up to 55.000 DWT. It is installed on an off-shore platform and designed to work on both side of platform with boom length 30mt.
In the pictures, the shiploader while is being loaded onto the ship ready to be shipped.