BLOG

Bedeschi clinker terminal in Cyprus

Bedeschi was awarded of a contract to realize a clinker export terminal. The system has been installed in the port terminal of the cement plant equipped with a shiploader on tyres and with surface feeder. Once at the terminal, the material is discharged on the surface feeder from the trucks. The feeder is directly connected with belt conveyors to the shiploader. All the system moves along the quay as to optimize vessels loading. The capacity is up to 550 t/h. Bedeschi next goal is to implement the capacity to 800 t/h.

Read more case studies here: https://www.bedeschi.com/handling-systems/cement/