We are successfully proceeding with the commissioning of the shiploaders for grain for our client Kernell at Odessa.
The first shiploader, perfectly in operation, have already loaded ships for a total of 300.000 tons. The second shiploader, at the erection phase, will be delivered in the next months.
![](https://www.bedeschi.com/wp-content/uploads/2020/04/20200212_075248-min-1024x768.jpg)
![](https://www.bedeschi.com/wp-content/uploads/2020/04/20200215_104734-min-1024x768.jpg)