At the beginning of this year, Bedeschi was awarded a bauxite storage facility for Guinea Alumina Corporation part of Emirates Global Aluminium in ABU DABHI by DTP Mining, part of Bouygues Construction (France). The plant is located in Kamsar (North of Guinea, Boke Region), and the scope of supply includes a stacker with a capacity of 3000 t/h and a 420 meters long storage belt conveyor. The commissioning phase was performed last September.
It is a stacker for handling bauxite both in dry and wet conditions, when the material becomes sticky due to the humidity. The material is stored in two stockpiles of 160.000 tons each with chevron method. The machine has a capacity of 3000 tph and a 42 meters long boom.
Leveraging on our experience with moist, plastic and sticky material with our proprietary bucket solutions we can offer now a wide variety of tailor-made solutions to transport and store any type of bulk material like coal, clay, iron ore, limestone, fertilizer, clinker, cereals and many others, covering any capacity from 100 to 10.000 ton per hour.