VOTORANTIM CIMENTOS CHOOSES BEDESCHI FOR THE PRIMAVERA PROJECT

Published on January 30, 2015
IMG_0495

Thanks to its great experience in the sector, Bedeschi had been selected to realize the Primavera Project, a limestone storage for Votorantim Cimentos in the city of Curimba (Brazil). The supply consists of a storage system with two stacking bridges type STKP (Tripper TRP 16/1400) and a reclaimer type BEL C with a stacking capacity of 700 t/h and a reclaiming capacity of 100 to 500 t/h.
The BEL C system, based on the creation of rectangular section piles, is composed of an interconnected system with a tripper, two bridge stackers and one overhead bucket reclaimer, to provide a complete remote automatic material stacking and reclaiming process. This special Bedeschi technology allows achieving a very high blending effect.
The supply includes also a crushing group with an apron feeder (CNA 10/2200 B), a primary and a secondary toothed roller crushers (RL 650/2200). Due to the low peripheral speed Bedeschi roller sizers are characterized by a very low power consumption compared to traditional crushers.
The machines will be commissioned within the end of 2015.
This contract shows how Bedeschi is strengthening its presence in the bulk handling and mining industries in the South America marketplace.

Home Page | Bedeschi

Contacts | Bedeschi